COMMITTEE CENTRAL chevron_right POST CONSTRUCTION SUBCOMMITTEE ON FLANGE JOINT ASSEMBLY (PCC)

MY COMMITTEE PAGE
Charter

The Post Construction Subcommittee on Flange Joint Assembly establishes and maintains PCC-1, Guidelines for Pressure Boundary Bolted Flange Joint Assembly, to promote a high level of leak-tightness integrity of bolted joints for both new and existing pressure-containing equipment and piping normally encountered in industry, as follows: • Effective pressure-boundary, bolted flange-joint assembly procedures covering a broad range of flange sizes and service conditions and • Uniform criteria for the training, qualification and certification of bolted flange-joint assembly personnel. 



Officers
CHAIR Warren Brown, Ph.D. VICE CHAIR Kelly Schupp SECRETARY Chris Cary
Staff Contact
Steven Rossi
The American Society of Mechanical Engineers
Two Park Avenue
New York, NY 10016
phone1(212)591-7522
email rossisj@asme.org

Other Links

* This document is for ASME committee use only, and not for any other distribution, republication or resale purposes. Any other reproduction or use of this document, in full or part, is strictly prohibited.