Record#: | Code Sections Affected by the Proposed Revision | Proposal: | Staff Contact: | Comment Period End Date: | File: |
---|---|---|---|---|---|
Nondestructive Examination - 20XX |
|||||
15-1862 |
BPVC-V
|
Addition of rules for Transfer Correction for Calibration and Examination Differences in Surface Finish, Heat Treatment, and other conditions. Rules to be added as an Appendix (Nonmandatory) to ASME Section V Article 4 & 5 as General Techniques For Straight Beam and Angle Beam Transfer Correction | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-855 |
BPVC-V
|
Adoption of ASTM E750-15 as SE-750-15 | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-856 |
BPVC-V
|
Adoption of ASTM E976-15 as SE 976-15 | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-857 |
BPVC-V
|
Adoption; ASTM E1419/E1419M-15a as SE1419/SE1219M-15a | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-2032 |
BPVC-V
|
Review of Mandatory Appendix IX-492 | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-2951 |
BPVC-V
|
Proposal for changes to ASME Section V, Article 2, Mandatory Appendix II, paragraphs II-221 and II-286. Also, Review for Adoption of ASTM E1255 - 16 Standard Practice for Radioscopy | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
17-2978 |
BPVC-V
|
Adoption of ASTM E2775-16 Standard Practice for Guided Wave Testing of Above Ground Steel Pipework Using Piezoelectric Effect transducer to SE-2775. | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
18-342 |
BPVC-V
|
For T-277.1(a), add a reference to SE-747 for wire type IQIs when selecting the material of separate blocks when it is not practical to place the IQI(s) on the part or weld. | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
18-1337 |
BPVC-V
|
Clarify Figure III-463.5 in Article 4 | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
18-1454 |
BPVC-V
|
See C.1 for the latest proposal file. | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
18-3016 |
BPVC-V
|
Review Article 2, Mandatory Appendix IX to correct use of 'digital" versus "direct" radiography | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
19-394 |
BPVC-V
|
To editorially correct the incorrect reference in Para. XI-481.1 | Carlton Ramcharran | 02/04/20 | Public Review Draft File |
Rules for Construction of Nuclear Facility Components - 20XX |
|||||
10-220 |
BPVC-III-NCA
|
Add N-type certification requirements to NCA-3862.2 | Allyson Byk | 01/13/20 | Public Review Draft File |
11-1976 |
BPVC-III-A
|
A new criterion is added to XIII-3430 to explicitly address the ratchet limit due to thermal membrane stress in addition to combined thermal membrane plus bending stress rage in the existing XIII-3430. As a result thermal membrane and bending stress can be removed from the 3 Sm limit when determining whether simplified elastic-plastic analysis may be performed in XIII-3450 (a). | Allyson Byk | 01/13/20 | Public Review Draft File |
12-715 |
BPVC-III NE
BPVC-III NF
|
Revise NE-4211 and NF-4211 to be aligned with NB/NC/ND/WB/WC/WD-4211. | Allyson Byk | 01/13/20 | Public Review Draft File |
12-1991 |
BPVC-III-NCA
|
Revise NCA-5125 (f), (g), and (i) to not audit the Certificate Holder during the year that ASME holds a survey on the Certificate Holder. | Allyson Byk | 01/13/20 | Public Review Draft File |
13-2002 |
BPVC-III NB
|
Add thickness formulas for nonspherical heads to NB-3324 | Allyson Byk | 01/13/20 | Public Review Draft File |
14-874 |
BPVC-III NF
|
Adding a reference to Appendix CC for NF General Requirements. | Allyson Byk | 01/13/20 | Public Review Draft File |
15-1807 |
BPVC-III-NCA
|
Revise Certificate Holders' requirements paragraphs to remove "manufacture & supply of" and replace with "furnishing" material | Allyson Byk | 01/13/20 | Public Review Draft File |
16-820 |
BPVC-III-3
|
Revise Figures WB-3221-1, WB-3222-1 and WB-3224.1-1, paragraphs WB-3224(b), WB-3234(a) and WB-3234(b), and add a new paragraph WB-3234(c) to clarify the requirements for the hypothetical fire event. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-1124 |
BPVC-III-A
|
Add Nonmandatory Supplement XXVI-E for nonmandatory method of qualification for HDPE flanged joints. Revise XXVI-4521 to allow for the use of Nonmandatory Supplement XXVI-E. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-1203 |
BPVC-III-A
|
Based on discussions with Task Group Appendix V and with SGGR, it was concluded that we would create individual instructions for each data report and ballot them separately. This proposal represents the first changed data report the N-2. The structure of the existing table proved very problematic in adding any new forms and providing sufficient instruction. Additionally, it was determined that new users required more detailed and stand alone guidance for each form. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-2148 |
BPVC-III-3
|
Revise ASME BPVC, Section III, Division 3, Subsections WB, WC and WD to better clarify the prohibited use of EGW and ESW welding processes, and continuous drive friction and specially designed seal welds in Division 3.. In addition, make minor changes to terms and phrases to promote consistency throughout the subsections. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-2224 |
BPVC-III NB
|
Revise NB-3500 to define requirements for safety relief devices that better align with wording in NB-2000. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-2225 |
BPVC-III NC
BPVC-III ND
|
Revise NC/ND-3500 to define requirements for safety relief devices that better align with wording in NC/ND-2000. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-2226 |
BPVC-III-A
|
Revise the NV-1 form to define requirements for safety relief devices that better align with wording in NB-2000. | Allyson Byk | 01/13/20 | Public Review Draft File |
16-2926 |
BPVC-III-2
|
Change CC-4121.1 to say "....the Fabricator or Constructor shall certify that they have fulfilled those requirements..." | Allyson Byk | 01/13/20 | Public Review Draft File |
17-415 |
BPVC-III NB
BPVC-III NC
BPVC-III ND
|
Revise material specification requirements to NB-2121(a) and NC-2121(c) to ensure consistency when referencing bolting material Tables in each Subsection. | Allyson Byk | 01/13/20 | Public Review Draft File |
17-1280 |
BPVC-III-A
|
Appendix XXIII: Table S2-1 (page 157) - Delete reference to NCA-6000 from Divisions 1, 2, and 5. Appendix XXIII: Table S2-3 (page 159) - Change reference for NCA-1250 to NCA-1230 Appendix XXIII: Table S2-3 (page 160) - Replace NF-3600 with NF-3100 through NF-3600; Delete references to F-1321 and F-1370 | Allyson Byk | 01/13/20 | Public Review Draft File |
17-1853 |
BPVC-III NE
|
Add note to figure to clarify applicability to configurations other than just flanges. | Allyson Byk | 01/13/20 | Public Review Draft File |
17-2636 |
BPVC-III-A
|
Revise XXVII-2300 to ensure wording is clear | Allyson Byk | 01/13/20 | Public Review Draft File |
17-2647 |
BPVC-III-3
|
Eliminate references to Appendix F in Article WD-3200 and substitute applicable requirements from other sections. | Allyson Byk | 01/13/20 | Public Review Draft File |
17-2663 |
BPVC-III-3
|
Update ASME BPVC, Section III, Division 3, Subsection WC to incorporate similar changes made to subsection WB per approved Record# 16-2761. | Allyson Byk | 01/13/20 | Public Review Draft File |
17-2943 |
BPVC-III-2
|
Define the term “tension tie member”. | Allyson Byk | 01/13/20 | Public Review Draft File |
17-3188 |
BPVC-III-3
|
Revise Subsections WB/WC/WD to delete socket welds | Allyson Byk | 01/13/20 | Public Review Draft File |
18-108 |
BPVC-III-3
|
Update Section III Div 3 Table WA-7000-1 to incorporate the latest published editions of the reference standards. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-303 |
BPVC-III-NCA
|
Update NCA-3461(a), NCA-3561(a), NCA-3661(a), NCA-3684(a), and NCA-3785.1(a). | Allyson Byk | 01/13/20 | Public Review Draft File |
18-500 |
BPVC-III-5
|
New Division 5 Table HAA-8100-1, which mirrors Table NCA-8100-1 but is specific to the classifications of Division 5. Associated changes are also being made to Div. 5 for inclusion and reference to Table HAA-8100-1. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1052 |
BPVC-III NE
BPVC-III NG
BPVC-III-A
|
Delete NE-3228.1(a), NG-3228.1(a), and XIII-3440(c) | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1099 |
BPVC-III-2
BPVC-III-NCA
|
Revision to CC-2442.3.1(d) | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1494 |
BPVC-III-A
|
Align requirements between Section III and Section VIII for C.E. qualification. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1763 |
BPVC-CC-NC
|
Modify Code Case N-861 to include 9Cr-1Mo-V steel as an acceptable material. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1764 |
BPVC-CC-NC
|
This proposal modifies Code Case N-862 to include Grade 91 steel as an acceptable material for use with the EPP creep-fatigue design method. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-1788 |
BPVC-CC-NC
|
Update Code Case N-290-1. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-2455 |
BPVC-III NC
|
Revise the General Note on the subject figures to change .25*sqrt(Rt) to 0.5*sqrt(Rt) | Allyson Byk | 01/13/20 | Public Review Draft File |
18-2583 |
BPVC-III-A
|
Revise Appendix XXI, Para XXI-1110 Scope to clarify the intent of the requirements. | Allyson Byk | 01/13/20 | Public Review Draft File |
18-2678 |
BPVC-III-A
|
Remove "1989" from paragraph XXIII-1223(b)(2) and revise footnote 21 | Allyson Byk | 01/13/20 | Public Review Draft File |
18-2750 |
BPVC-III-5
|
Add equations describing the isochronous stress-strain curves in Section III, Division 5, Nonmandatory Appendix HBB-T-1800 and makes some corrections to the plotted curves | Allyson Byk | 01/13/20 | Public Review Draft File |
19-311 |
BPVC-III-NCA
|
Correct citations to NCA-5122 and NCA-5123 | Allyson Byk | 01/13/20 | Public Review Draft File |
19-312 |
BPVC-III-NCA
|
Correct citiation NCA-5122 to read NCA-5123 in NCA-3463, NCA-3563, NCA3663, NCA3763, NCA-3785.3, and Glossary definition of Inspector | Allyson Byk | 01/13/20 | Public Review Draft File |
19-338 |
BPVC-III NF
|
This request is to review the updated Table NF-3312.1(b)-1 in the 2017 edition which has added Service Level D stress limits. Note 3 of Table NF-3312.1(b)-1 originally applied only to Service Level B and C, and limited the total stress to 0.7Su and 1.2Sy. For service level D, based on non-mandatory appendix F, this limit applied only to stress in tension; other stress limits need to be considered. | Allyson Byk | 01/13/20 | Public Review Draft File |
19-413 |
BPVC-III-NCA
|
Change NCA-3551.3 to require the Certified Design Report Summary to be certified by a Certifying Engineer. | Allyson Byk | 01/13/20 | Public Review Draft File |
19-1057 |
BPVC-III-A
|
Revise wording of end note 21 to remove signatory country names and replace those with a reference to the Washington Accord web site for signatory listing. | Allyson Byk | 01/13/20 | Public Review Draft File |
|