C&S Connect
 

ASME BOILER AND PRESSURE VESSEL CODE
Code Case Review
( Items displayed on this site are code cases currently available for review )

Public review is not required for Code Cases, however, comments on the proposal may be submitted for committee consideration. Comments should be addressed to the Staff Contact indicated for the particular proposal.
Record#: BPV Code Sections Affected by the Proposed Revision Proposal: Staff Contact: Comment Period End Date: File:

- 20XX , Rules for Construction of Nuclear Facility Components

12-1980
BPVC-III ND
New Code for HDPE above ground piping Allyson Byk 11/26/18 Public Review Draft File

- 20XX , Hydrogen Piping and Pipelines

13-487 Revise Para PL3.7.1(b)(2)(a)(4) to provide fatigue crack growth rate equation as shown in the proposal file Justin Wu 11/26/18 Public Review Draft File

- 20XX , Rules for Construction of Nuclear Facility Components

15-2546
BPVC-CC-NC
Annul Code Case N-510-1. Allyson Byk 11/26/18 Public Review Draft File
15-2547
BPVC-CC-NC
Annul Code Case N-728 Allyson Byk 11/26/18 Public Review Draft File
16-1152
BPVC-CC-NC
Adopt the Proposed Code Case for determining the strain rate when evaluating environmental fatigue effects for NB-3200 analyses. Allyson Byk 11/26/18 Public Review Draft File
17-978
BPVC-III NF
Remove non-relevant categories and correct notes wording. Allyson Byk 11/26/18 Public Review Draft File
17-1566
BPVC-CC-NC
The proposed code case will provide rules for construction of items by Certificate Holders prior to the establishment of an Owner Allyson Byk 11/26/18 Public Review Draft File
18-31
BPVC-CC-NC
Inquiry: Under what conditions are alternatives permitted to the requirements of NB-4424.2(a) and the configurations of Figure NB-4250-2 or Figure NB-4250-3? This Code Case provides rules for alternate configurations and surface finish to those described in NB-4424.2(a) and shown in Figure NB-4250-2 or Figure NB-4250-3 to be used for weld joints subject to preservice inspection. Allyson Byk 11/26/18 Public Review Draft File
18-850
BPVC-CC-NC
Review NRC DG-1233 for comments on CCN-721 Allyson Byk 11/26/18 Public Review Draft File
Minimum Site Requirements: IE 6.0+Firefox 2.0+Chrome 4.0+

Copyright © 1996-2016 ASME. All Rights Reserved. Terms of Use | Privacy Statement