STANDARDS COMMITTEE ON OPERATION AND MAINTENANCE OF NUCLEAR POWER PLANTS
 
Back to home page of the committee
  Meetings
 
 
  This Committee
Please LOGIN to Reveal Members-Only Features
 
 
 
 
 
 
 
  Codes & Standards Resources
 
 
 
 
 
 
 
 
 
  Publication Information
 
 
 
 
 
 
 
 
 
 
O&M CASES
 
Sub-Folders
 
OM Cases
 
Applicability Index revised 7/01/2022 as referenced by the NRC (755KB)
Applicability Index revised 11/21/2022 (756KB)
Case # OMN-1 (Revision 2), Alternative Rules for Preservice and Inservice Testing of Active Electric Motor Operated Valve Assemblies in Light-Water Reactor Power Plants (1054KB)
Case # OMN-3, Requirements for Safety Significance Categorization of Components Using Risk Insights for Inservice Testing of LWR Power Plants (1117KB)
Case # OMN-4, Requirements for Risk Insights for Inservice Testing of Check Valves at LWR Power Plants (1013KB)
Case # OMN-6, Alternate Rules for Digital Instruments (1080KB)
Case # OMN-7, Alternative Requirements for Pump Testing (1022KB)
Case # OMN-8, Alternative Rules for Preservice and Inservice Testing of Power-Operated Valves That Are Used for System Control and Have a Safety Function Per OM-10, ISTC-1.1, or ISTA-1100 (1066KB)
Case # OMN-9, Use of a Pump Curve for Testing (1145KB)
Case # OMN-10, Requirements for Safety Significance Categorization of Snubbers Using Risk Insights and Testing Strategies for Inservice Testing of LWR Power Plants (1147KB)
Case # OMN-11, Risk-Informed Testing for Motor-Operated Valves (1093KB)
Case # OMN-12, Alternate Requirements for Inservice Testing Using Risk Insights for Pneumatically and Hydraulically Operated Valve Assemblies in Light-Water Reactor Power Plants (OM Code-1998, Subsection ISTC) (1141KB)
Case # OMN-13 (Revision 4), Performance-Based Requirements for Extending Snubber Inservice Visual Examination Interval at LWR Power Plants (1133KB)
Case # OMN-15 (Revision 3), Performance-Based Requirements for Extending the Snubber Operational Readiness Testing Interval at LWR Power Plants (1444KB)
Case # OMN-15 (Revision 4), Performance-Based Requirements for Extending the Snubber Operational Readiness Testing Interval at LWR Power Plants (1388KB)
Case # OMN-16 (Revision 2), Use of a Pump Curve for Testing (1123KB)
Case # OMN-17 (Revision 1), Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves (124KB)
Case # OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within ±20% of Design Flow (1074KB)
Case # OMN-19, Alternative Upper Limit for the Comprehensive Pump Test (1081KB)
Case # OMN-20, Inservice Test Frequency (1012KB)
Case # OMN-21, Alternative Requirements for Adjusting Hydraulic Parameters to Specified Reference Points (1071KB)
Case # OMN-22, Smooth Running Pumps (100KB)
Case # OMN-23, Alternative Rules for Testing Pressure Isolation Valves (690KB)
Case # OMN-24, Alternative Requirements for Testing ASME Class 2 and 3 Pressure Relief Valves (For Relief Valves in a Group of One) (104KB)
Case # OMN-25, Alternative Requirements for Testing Appendix I Pressure Relief Valves (71KB)
Case # OMN-26, Alternate Risk-Informed and Margin Based Rules for Inservice Testing of Motor Operated Valves (136KB)
Case # OMN-27, Alternative Requirements for Testing Category A Valves (Non-PIV/CIV) (646KB)
Case # OMN-28, Alternative Valve Position Verification Approach to Satisfy ISTC-3700 for Valves Not Susceptible to Stem-Disk Separation. (613KB)
Case # OMN-29, Pump Condition Monitoring Program (2883KB)
Case # OMN-30, Alternative Valve Position Verification Approach to Satisfy ISTC?3700 (593KB)
Case # OMN-31 Alternative to Allow Extension of ISTA?3120 Inservice Examination and Test Intervals From 10 Years to 12 Years (123KB)
Minimum Site Requirements: IE 6.0+Firefox 2.0+Chrome 4.0+

The American Society of Mechanical Engineers
Copyright © 1996- ASME. All Rights Reserved. Terms of Use | Privacy Statement