ASME procedures provide for reconsideration of this interpretation when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the foreword of our standards, ASME does not "approve", "certify", "rate", or "endorse" any item, construction, proprietary device or activity."
|
|
2001 - Para. 4.4.3.1 and MFC-3M (23KB)
|
|
2002- Sections 3.1.2.3, 4.3.5.4 & 5.4.2.1, Location of inlet dry bulb temperature measurement (22KB)
|
|
Photos for above technical inquiry (4310KB)
|
|
2002 - Table 5.1, and equations 5.3.3 & 5.3.4, Turbine Heat Rate Correction (24KB)
|
|
2003-04 - Appendix G, Placement of the Cooling Tower Inlet Air Humidity Sensors (19KB)
|
|
2003-09- Paras. 4.1.3.4 & 4.4.3, Orifice Flow Calculations (158KB)
|
|
2008-02 - Table 3.2, Establishing Allowable Deviations from Design (14KB)
|