PTC 46 OVERALL PLANT PERFORMANCE TEST
 

IMPORTANT NOTE

C&S Connect will be unavailable for maintenance on Saturday, January 30, 2021, from 9:00 am to 6:00 pm (EST). We apologize for any inconvenience.
Thank you.

Back to home page of the committee
  Meetings
 
 
  This Committee
Please LOGIN to Reveal Members-Only Features
 
 
 
 
 
 
 
 
  Codes & Standards Resources
 
 
 
 
 
 
 
 
 
 
 
  Publication Information
 
 
 
 
 
 
 
 
 
 
 
 
 
PTC 46 Technical Inquiries
 
 
Technical Inquiries
ASME procedures provide for reconsideration of this interpretation when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the foreword of our standards, ASME does not "approve", "certify", "rate", or "endorse" any item, construction, proprietary device or activity."

2001 - Para. 4.4.3.1 and MFC-3M (23KB)
2002- Sections 3.1.2.3, 4.3.5.4 & 5.4.2.1, Location of inlet dry bulb temperature measurement (22KB)
Photos for above technical inquiry (4310KB)
2002 - Table 5.1, and equations 5.3.3 & 5.3.4, Turbine Heat Rate Correction (24KB)
2003-04 - Appendix G, Placement of the Cooling Tower Inlet Air Humidity Sensors (19KB)
2003-09- Paras. 4.1.3.4 & 4.4.3, Orifice Flow Calculations (158KB)
2008-02 - Table 3.2, Establishing Allowable Deviations from Design (14KB)
Minimum Site Requirements: IE 6.0+Firefox 2.0+Chrome 4.0+

Copyright © 1996-2016 ASME. All Rights Reserved. Terms of Use | Privacy Statement