GO TO ASME.ORG HOME >
PTC 6.2 STEAM TURBINES IN COMBINED CYCLES
IMPORTANT NOTE
C&S Connect will be unavailable for maintenance on Saturday, January 30, 2021, from 9:00 am to 6:00 pm (EST). We apologize for any inconvenience.
Thank you.
Meetings
ASME Anywhere Initiative – Virtual-Only C&S Meetings through December 2021
Furture Meetings
This Committee
Please LOGIN to Reveal Members-Only Features
PTC Document Status/Tracking Report
PTC Reports and Lists
PTC Lexicon - July 2019
Article - Power Plant Efficiency Reduce Cost
PTC Progress Reports
BST Reports & Balanced Scorecard
PTC Brochures/Sell Sheets
PTC 6.2 Sell Sheet
Codes & Standards Resources
Participation
Volunteer Recruiting Toolbox
ASME C&S Policies, Procedures, and Guides
S&C Successful Practices for ASME Standards Development Committees
S&C Training Modules
S&C Vision and Mission Statement
Guide to Submitting Inquiries & Revisions
Board on Standardization & Testing Interpretation Policy 2019
Standardization & Testing Department Procedures
Standardization & Testing Awards & Medals
Committee Handbook
Publication Information
Project Initiation Notices
Public Review Drafts
Proposed Changes
Posted PTC Interpretations and Code Cases
Continuous Maintenance/Document Maintenance Cycle
PTC Documents - General
Redesignated, Consolidated, Transferred & Withdrawn Standards
PTC Cases for Public Review
Recently Published Standards in STND Department -1/4/2020
PTC Cases
PTC 6.2 TECHNICAL INQUIRIES
Errata
PTC 6.2 TECHNICAL INQUIRIES
PTC 6.2 TECHNICAL INQUIRIES
2004-12 - Para. 3.2.4 Benchmark Testing and Table 3.4 (13KB)
2006-02 Determination of the discharge coefficient using curve fit. (15KB)
2012-01, Table 4-4.1.5.2, Use of a Coriolis Meter as a Class 1 Primary water flow measurement (9KB)
2013-02 Para. 4-8.15 Feedwater Flow Measurement (10KB)
Minimum Site Requirements:
IE 6.0+
Firefox 2.0+
Chrome 4.0+
Copyright © 1996-2016 ASME. All Rights Reserved.
Terms of Use
|
Privacy Statement