Interpretation Detail  
Standard Designation: B31.8
Edition/Addenda:
Para./Fig./Table No:
Subject Description: ASME B31.8-2007, Para. 802.12(f), Injection and Production Flow Lines
Date Issued: 03/23/2011
Record Number: 07-1469 and 07-1470
Interpretation Number : 16-13
Question(s) and Reply(ies):

Question (1): In accordancewith ASME B31.8-2007, does the Code exclude flow lines between gasinjection wells and gas injection facilities?

Reply (1): Yes.

Question (2): In accordance with ASME B31.8-2007, does the Codeexclude flow lines between gas production wells and gas separationfacilities?

Reply (2): Yes.




Copyright © 2021 by the American Society of Mechanical Engineers. No reproduction may be made of this material without written consent of ASME